Rodolfo Huys Graphic Designer

ABOUT

Factory builder contacted me to implement corporate signage for Eurocopter. The main task was to coordinate the project from design planning, material checks to final placement. We were under a tight deadline and had to cope with very stringent security requirements due to the signage being equipped with electrical connections and installed close to helicopter operations and fuel vapours residues.

MADEIT CREDITS

  • Romina CedeƱoClient

Signage Design

*
*

Comments