ABOUT

Fully Lighting design package over multiple floors to comply with all RIBA stages over a 18 month process. From initial conception through to project completion. Detailed manufacturing drawings, complete 3D illumination calculations, and detailed lighting plans with circuit and dimming suggestions to work within the local in-house existing system. We provided all luminaire specifications, and power saving calculations.

MADEIT CREDITS

  • Unibail-Rodamco-WestfieldClient
Project featured: on 4th June 2026

The Village

*
*
*
*
*
*
*
*
*

Comments

SHARE