Patrick de Warren
Paris
ABOUT
An Awareness Campaign on the life of U.S Veterans and their strugle dealing with medical debts and suicides.
"Veteran Suicide "Its Reality and its Stigma.
A Collective Dreams Project Film Production by Patrick de Warren in collaboration with Let's Rethink This.
The individuals, their names and incidents described
portrayed in the movie production are real.
LRT/#EVMD and Collective Dreams Project Film Productions in no way intend to disparage or disminish the good and important work by the VA .
Our purpose is to report truthfully the experiences
that veterans are having within and outside of its system.
#patrickdewarren
#veterans
#veteranSuicide
